October 6, 2008

Speeding through the workshop expansion.  Finished wall between “mezzanine” and garage stairs, wired for electrical outlets in the new space, moved the fridge next to the furnace, and installed a new fluorescent fixture in the new area and moved the incandescent fixture out into the garage stairs area.

081006workshop.jpg

Fridge moved (itself) to space next to furnace, where shelves used to reside.

081006workshop1.jpg

Prior to installing the fluorescent fixture.

081006workshop0.jpg

Wall finished, needs insulation and surfacing (probably particle board left over from the tear out).

081006workshop3.jpg