August 28, 2012

The box is constructed, and we have an intact uke.  This morning I removed the kerf clamps.

120828kerf

The back was radiussed to 15′ in a sanding dish.  The back was trimmed to outside the side line and the braces were finish sanded.  Using the uke workboard, the back was glued on and held in place with spool clamps.  It was allowed to dry for 2 hours, then the scarf was removed using a laminate router.

120828backon

Before tackling the binding, I will install a butt graft.  Still pondering the binding options.  Remind self to bind before gluing on fretboard.